1. NISBET LODGE EMERGENCY MEASURES PLAN
  2. DRAFT CODE YELLOW 03-AUG-2014
  3. EDP 12.0 Directory
  4. EDP 12.1 General Information
  5. EDP 12.1.2  Outside Contractors Services
  6. EDP 12.1.3 Request of Availability of Next of Kin in the Event of a Disaster
  7. EDP 12.1.3.F1 Request of Availability of N.O.K. in the Event of a Disaster
  8. EDP 12.1.4 List of Recieving Facilities in the Event of an Evacuation or Relocation
  9. EDP 12.1.5 Manager On Call
  10. EDP 12.2 Internal Disasters
  11. EDP 12.2.3 Loss of Water
  12. EDP 12.2.4 Sprinkler Flood Quick Response
  13. EDP 12.2.5 Schematic – Sprinkler Valve
  14. EDP 12.2.7 Main Sewer Blocked (Basement)
  15. EDP 12.2.8 Schematic – Main Sump for Sewer
  16. EDP 12.2.9 Elecator Breakdown, After Business Hours, Weekends, and Holidays
  17. EDP 12.2.10 Main Power Failure, After Buisness Hours, Weekends, and Holidays
  18. EDP 12.2.11 Schemtic – Emergency Generator
  19. EDP 12.2.13 Schematic – Transformer
  20. EDP 12.2.14 Gas Leak
  21. EDP 12.2.15 Schmatic – Local Gas Valve – Kitchen
  22. EDP 12.2.16 Schematic – Main Valves for Water-Gas Supply Local Valves
  23. EDP 12.2.17 Schematic – Main Gas Valve
  24. EDP 12.2.18 Garbage – NO PICK UP
  25. EDP 12.2.19 Chemical Internal Spill-Leak as Issued by Executive Director – Copy
  26. EDP 12.2.19 Chemical Internal Spill-Leak as Issued by Executive Director
  27. EDP 12.3 Code Yellow
  28. EDP 12.3.F1 Assignment Sheet for Search Parties
  29. EDP 12.3.F2 Wandering Incident Procedure
  30. EDP 12.3.F5 Instructions
  31. EDP 12.4 Code White
  32. EDP 12.5 Code Blue
  33. EDP 12.7 Code Orange – External Disaster
  34. EDP 12.8 Code Black – Bomb Threats
  35. EDP 12.8.F1 Bomb Threat Form
  36. EDP 12.9 Code Brown – Hazardous Materials Spill
  37. EDP 12.10 Code Grey – External Air Exclusion
  38. EDP 12.11 Code Purple – Person Stuck in Elevator
  39. EDP 12.12 Code Red
  40. EDP 12.13 Code Green – Code Green-STAT – Total Evacuation
  41. EDP 12.13.F1 Staffing Pool Check-In and Assignment Sheet
  42. EDP 12.13.F2 Record of Transfer of Evacuated Individual
  43. EDP 12.13.F3 Call Back Fan Out Response
  44. EDP 12.13.F4 Employee Emergency Fan-Out Call List
  45. EDP 12.14 Code Debrief Report
  46. EDP 12.15 Utility Failure – Loss of Power
  47. EDP 12.22 Flood
  48. EDP Schematic – Main Breaker
  49. EDP Schematic – Main Valves for Water-Gas Supply
  50. Employee emergency plan list of Interpreters
  51. Labels for Emergency Code Binders
  52. Map # 1 – Pape to O’Connor
  53. Map # 2 – North on Pape to Gertrude Place
  54. Map # 3 – Pape to Gerrard Street East
  55. Map # 4 – Green P Parking Lots to Donlands Avenue
  56. Map # 5 – West to Broadview Avenue and Back
  57. Map # 6 – West and East on the Danforth
  58. Map # 7 – West to Chester
  59. EDP Schematic – Main Valves for Water-Gas Supply
  60. EDP Schematic – Main Breaker
  61. EDP 12.22 Flood